View Details

Return to the Bids Homepage

Bid Classification: 
Construction
Bid Type:  RFQ
Bid Number:  RFQ 24-20
Bid Name:  Mechanical systems replacement
Bid Status:  Awarded
Bid Awarded Date:  Mon Feb 26, 2024 (EST)
Bid Closing Date:  Tue Feb 20, 2024 2:00:00 PM (EST)
Question Deadline:  Mon Feb 5, 2024 4:00:00 PM (EST)
Duration in months:  14
Negotiation Type:  Refer to RFQ document
Condition for Participation:  Refer to RFQ document
Electronic Auctions:  Not Applicable
Language for Bid Submissions:  English unless specified in the bid document
Submission Type:  Online Submissions Only
Submission Address:  Online Submissions Only
Public Opening:  No
Description: 

The scope of this project includes removal of approximately 30 original geothermal heat pumps, two large central ventilation units, all associated interior pipe distribution and ancillary systems. The geothermal wells will be abandoned in place. There is no central boiler plant in this building.

The replacement HVAC system will be all-electric, utilizing air source heat pumps located in generally the same locations as the previous geothermal heat pumps. The system is sized and selected to operate during ultra-low ambient conditions in order to provide year-round heating and cooling through the new heat pumps. New central ventilators will replace the former units. The majority of the existing duct work will be utilized with modifications required at connection points to new equipment. New air conditioning will also be provided in the main foyer of the school. 

New structural steel framework is required for HVAC equipment located on the roof. Structural framing will be located above the roof and some roof system repairs will be required at connection points to the existing structure

Finally, a new building automation system will be provided connecting all new equipment. Some existing exhaust fans and supplemental heaters will be added to the new BAS as well.

Construction will be provided in two phases as part of this contract. Phase 1 will be carried out during the summer of 2024. All construction work in 2024 must be complete, functional and ready for occupancy by the end of August 2024. All remaining work will be completed during the summer of 2025.

Bid Document Access:  Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $418.95, per bid fee - $125.75).
Trade Agreements:  Show Trade Agreements [+]
Canadian Free Trade Agreement (CFTA)
Categories:  Show Categories [+]
  • Trade Services
    • Heating, Ventilating and Air Conditioning (HVAC)
    • Roofing and Siding
  • Building Operation Supplies and Equipment - ONLY
    • Doors/Windows/Locks
  • Construction
    • Building & Renovation

Meeting Locations

The following are the meeting times and locations for the bid:


This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.

Awarded

The following are the awarded vendors for the bid:

​No Awarded Vendors

Bids Submitted

The following are the unofficial bid results

No submitted bids...

Plan Takers

The following are the plan takers for the bid:

There are no plan takers for this bid.
This information is only available to invited bidders and registered plan takers. To view this information you must login to your account.