View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | RFQ |
Bid Number: | RFQ 21-19 |
Bid Name: | Boiler and Fire Alarm Replacement at Rideau PS and Boiler Replacement at WJ Holsgrove PS |
Bid Status: | Awarded |
Bid Awarded Date: | Thu Feb 25, 2021 (EST) |
Bid Closing Date: | Tue Feb 9, 2021 2:00:00 PM (EST) |
Question Deadline: | Fri Jan 22, 2021 4:00:00 PM (EST) |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
This Request for Quotations (the “RFQ”) is an invitation by the Limestone District School Board (the “Board”) to prospective respondents to submit non-binding quotations for Boiler and Fire Alarm Replacement at Rideau Public School and Boiler Replacement at WJ Holsgrove Public School, as further described in Section A of the RFQ Particulars (Appendix D) (the “Deliverables”). (1) RFQ 21-19A Boiler and Fire Alarm Replacement at Rideau PS The project includes removal of the existing boiler plant including two cast iron boilers, pumps, piping, glycol loop heat exchanger, vents and associated devices and accessories. Replace with new boiler plant including six new condensing boilers, pumps, piping, glycol loop heat exchanger, vents and associated devices and accessories. Prior to removals the system flow rates will be measured, balancing valve positions recorded, and the entire system will be emptied and flushed. The existing building automation system will be upgraded to the Schneider EcoStruxure platform including new wiring, controllers, valves, actuators, sensors, and other devices. Additionally, the existing fire alarm control panel and separate annunciator panel will be removed and replaced with new. Provide full building fire alarm verification and full building audibility tests. Requirement of a building permit in only anticipated for the fire alarm replacement portion of the project. (2) RFQ 21-19B Boiler Replacement at WJ Holsgrove PS The scope of this project includes the demolition of two cast iron sectional boilers, chimneys, and pumps. The installation of two wall hung boilers, venting, piping, pump, and controls. |
Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $439.90, per bid fee - $132.04). |
Categories: |
Show Categories [+]
|